|
Two Zones Rotary Tube Furnace with 310A Alloy Processing Tube: 200mm I.D x 600 mm L, 900C Max - OTF-1200X-8-R-II
|
Click to enlarge
|
8 - 10 weeks leading time
Item Number: OTF-1200X-8-R-II
|
OTF-1200X-8-R-II is CE certified rotary tube furnace which is designed for calcining of metal oxide and inorganic compound continuously with yield of 5-10 kg/day, especially good for preparing Li-Ion battery cathode materials, such as LiFePO3 and LiMnNiO3 etc in R&D Laboratory.
Specifications:
|
Furnace Construction
|
|
|
Heating Zone length
|
500 mm with two heating zone
|
|
Processing tube
|
|
|
Max. Working Temperature
|
|
|
Temperature Controllers
|
Two PID digital temperatyre controller with 30 segment programmable
|
|
Temperature Uniformity
|
+/- 1 oC in heating Zone
|
|
Tube rotating Speed
|
0.3-8 RPM variable
|
|
Furnace tilt
|
0 - 35o
|
|
Chamber pressure
|
|
|
Production yield
|
5 kg / day depended on material
|
|
Power
|
10 KW Max
|
|
Voltage
|
208 - 240V single phase (70 A Breaker required)
|
| Warranty & Certificate
|
- One year limited warranty (Consumable parts such as processing tubes, o-rings and heating elements are not covered by the warranty, please order the replacement at related products below.)
-
CE certified
|
|
Furnace dimension:
|
1500 L x 1040 W x1800 H (mm)
|
|
Shipping weight
|
450 kg
|
|
Sale Price: USD$15,995.00
|
Sale Price: USD$18,995.00
|
|
Sale Price: USD$29,950.00
| | |
|
| | |
|
Your cart is empty.
Please clear the browsing history before ordering the product. Otherwise, availability and price are not guaranteed. | |
| | |
|
|
MS&T 2012, Booth# 536, Oct.9-10, 2012, Pittsburgh, PA, USA
 Nanotech 2012, Booth# 712, June 19-20, 2012, Santa Clara, California
ECS 221st, Booth#208, May 7-9, 2012, Seattle,WA, USA
SVC TechCon2012, Booth# 739, May 1- 2, 2012, Santa Clara, California
|
|
|
|
|

|
|
Notices
1. The price listed on line is valid for US market and who pay by credit card only. There will be extra cost for shipping and handling. The price is different from country to country
2. We may add extra cost for paper order and net 30 term due to extra labor cost
3. The price is subject to change without notice
|
|
|