Browse Categories
Search

15KW Induction Heating System with 8.5" Quartz Tube & Temperature-Controller up to 2000C - SP-85KTC


Please email for lead time

Product Options

Product Style:
SP-85KTC is a larger temperature-controlled induction heating/melting system with complete accessories, which includes a 15 KW Induction Heater, 8.5" (216mm) O.D Quartz Tube with Hinged type Flanges & Valves, Graphite Crucible & Refractory Assembly, 58L/m Recirculating Water Chiller, Vacuum Pump, and Mobile Cart. It is an ideal tool for growing crystal, melting, and sintering new metallic alloys with melting points < 2000ºC under protective gas environment.
WARNING: Please always keeps the pressure inside the vessel <0.02MPa relative to the atmosphere during the heating and inert gas filling. Please read the manual carefully, always wear a protective welding helmet, monitor, and properly control the pressure of the reaction vessel during the operation. Over pressurize the vessel can cause damage to the quartz tube, flange, and even personal injury.

SPECIFICATIONS:
Induction Heater

  • Working Voltage: 220V AC, 50/ 60Hz, Three Phases (380VAC, 3phase available upon request)
  • Working Current: 5~52 Amps (60A breaker required)
  • Max. Input Power: 15 KW
  • Output Frequency: 30 - 80 kHz 
  • Duty Cycle: 80%
  • Induction Coil: 220mm(ID) x 65mm(H) 
  • Air Cooling: Rear Fan
  • Protection: Automatic water pressure, over-temperature, and overpower protection
  • Refractory Assembling: Complete refractory assembling made of alumina, including bottom crucible support, crucible holder, and cover
Temp. Controller & Thermocouple



  • Precision digital temperature controller with Automatic PID tuning
  • 30 segments programmable for controlling heating and cooling rate as well as dwell time
  • Overheating & thermocouple failure protection
  • +/- 3 ºC temperature accuracy
  • +/- 3 ºC temperature accuracy
  • Thermocouple: C type (1/4"x16"L ) (pls click here to order spare as consumable)
  • Continuous Working Temp. Range: 1000ºC~1900ºC
  • Max. Working Temperature: 2000ºC (for less than an hour)
  • Max. Heating Rate: 
    • 4ºC/second (1000ºC-1200ºC)
    • 3ºC/second (1200ºC~1500ºC)
    • 1ºC~2ºC/second (1500ºC~2000ºC)
  • Optional: Eurothermo Controller with +/- 0.1ºC accuracy at an extra cost
Graphite Crucible & Refractory liners
    
  • High Purity Graphite Crucible: 114O.D x 100 ID x 142H ( mm) ( ~1 L)  is included for induction heating. Max. Loading Capacity: Up to 1/2 of the total volume of the graphite crucible.
  • Max. melting capability: 4 kg for Iron (tested)
  • Three-layer special design refractory liner can withstand temperatures up to 2200C
  • Note: Graphite crucible is consumable, please click the picture below-right to order spare
  •  
Sealing Flanges

Quartz Chamber
  • Two-end Open Quartz Tube is included with dimensions of 216 mm(OD) x 208 mm(ID) x 500mm(L), (click picture below-left to order spare or replacement)
  • Top Flange: Stainless steel hinged type flange with 1/4'' thermocouple feedthrough, needle valve, and the barb fitting. Please click the picture (bottom right) to view the details
  • Bottom Flange: Stainless steel flange with a needle valve and KF-25 vacuum port. Please click the picture (bottom-left) to view the details
  • KF25 right angle valve & clamps and 1 meter SS bellows are included for connecting to a vacuum pump
                     
Pressure Sensor

  • Anti-Corrosive Capacitance Diaphragm Gauge (Gas Independent), measurement range up to 3.8x10E-5 torr
  • One 24V,1A DC power adapter is included and ready to use. The input voltage for the adapter is 110~240V Single Phase.
Flow Meter
 
Water Chiller

  • Temperature range: 5 - 30°C
  • Water Flow Rate: 58 L/min
  • Water Tank: 15 Liters made of stainless steel
  • Note: It is recommended to use a specific coolant to get the best performance. It is normal to wait a couple of minutes for cooling down after several trials of heating
  • Note: the input voltage for the water chiller is 220V
Vacuum Pump

  • One 156 L/m Rotary Vane Vacuum Pump is included to achieve a 10e-2 torr vacuum.
  • If you choose a high-speed turbo-pump, the vacuum level can reach 10- 5 torr 
  • You may use the Gas purifier  to replace turbopump to keep gas purity < 1 ppm O2 and H2O
  •             (Hi-Speed turbopump) Gas purifier 
Heavy Duty Mobile Cart
 
    • Structure: Steel Frame Mobile Cart
    • 600mm(L) x 800mm(W) surface for placing Induction Heater & Quartz Tube with Flange
    Protective Sheild

    • For Non-UL Certified version, a protective shield made of polycarbonate will be provided.
    • For UL Certified version, a protective shield made of  PF will be provided.
    • The protective shield is to be placed around the quartz tube to contain any material debris if accidents happen.
                      
    Product Dimensions

            Please refer to the picture to the left for overall size info
    Warranty
    • One-year limited warranty with lifetime support
    • Consumable parts such as processing tube, thermocouple, refractory liners, o-rings and heating coil are not covered by the warranty
    Compliance

    • NRTL Certification is available upon request at extra cost
    • In order to pass NRTL, the system must be upgraded as the picture left
    • An isolated transformer will also be needed
    Operation Manual & Video                
    Application Notes




    Click here to learn more about the installation of a gas regulator.
    • Attention: Protective inert gas must be continuously filled throughout the experiment in order to protect the graphite crucible and C thermocouple.  The gas flow rate should be limited to <200 SCCM。 Never heat the furnace while the gas release valve is closed
    • The C-type thermocouple is consumable and is not covered by the manufacturer's warranty.
    • Please click here to learn how to set up the crucible for melting
    • The Induction Melting System is designed for use under vacuum and low pressure < 0.02 Mpa
    • Attention: A two-stage pressure regulator must be installed on the gas cylinder to limit the pressure to below 3 PSI for safe operation. Click here to learn the installation of a gas regulator. 
    •  PVT ( Physical Vapor Transportation ) system for growth bulk SiC crystal by changing a suitable crucible, please Pic below or ask our engineers how to
    • This furnace can be modified as RTP and HPCVD system with the gas delivery system.  Please click the Pictures below to see how.  If you have any special requirements, please let us know          
    •       
    Net Weight
    350 lbs
    Shipping Weight TBD
    Shipping Dimensions TBD

    Related Products

    Shopping Cart
    Your cart is empty.
    Please clear the browsing history before ordering the product. Otherwise, availability and price are not guaranteed.
    Mailing Lists
    MTI sponsorships:
    MTI Sponsors Thermoelectrics Workshop

    MTI-UCSD Battery Fabrication Lab

    MTI Sponsors the Postdoctoral Awards


    Upcoming Shows:

    APS March Meeting 2023 March 5-10 Las Vegas NV Booth 534

    TMS 2023 March 19 - 23 San Diego CA Booth 609

    40th International Battery Seminar Exhibit March 20-23 2023 Orlando FL Booth 121

    Recent Attended Shows:
    AABC USA 2022 December 5 - 8 San Diego CA

    2022 MRS Fall Meeting Nov 28 - Dec 2 Boston MA

    Click here to see our past conferences

     
    Notices
    1. Prices listed online are valid for the US market and who pay by credit card only. There will be extra charges for shipping & handling. Prices vary from country to country.
    2. We may add extra charges for paper orders and NET 30 terms due to extra labor costs.
    3. The prices listed are subject to change without notice.