Browse Categories
Search

Tech Support Center
If you are unable to find a solution here, please email us at info@mtixtl.com

Furnaces
X-Ray
 

 

Electric diagram: KSL-1600X (jpg)

 

How to maintain and repair SiC heated furnaces (KSL-1400X, etc)

  • SiC heating element's resistivity will increase when operating at high temperature, which will result in furnace power reduce; the meaning temperature will not reach to more than 1300oC. In order to keep longer service life of SiC heating element, you need to rewire SiC heating element with SiC resistivity increases from
    • 5 series and 2 parallel connection (new) (5S2P)
    • 2 series and 5 parallel connection (middle life) (2S5P)
    • 1 series and 10 parallel connection (old) (1S10P)
    • If 10P still can not give you enough power, you need to change SiC heating element  and start from 5S2P connection
    • Please click here to see diagram  on how to change wiring from 5S2P to 1S10P
  • Please be advised if furnace chamber cracked, you shall repair them using Al2O3 adhesive (click to order). If crack is too larger, you shall use high-temperature Al2O3 fiber to fill the cracks first, then put ceramic coating







Grinding / Polishing/Saw
Shopping Cart
Your cart is empty.
Please clear the browsing history before ordering the product. Otherwise, availability and price are not guaranteed.
Mailing Lists
MTI sponsorships:
MTI Sponsors Thermoelectrics Workshop

MTI-UCSD Battery Fabrication Lab

MTI Sponsors the Postdoctoral Awards


Upcoming Shows:

APS March Meeting 2023 March 5-10 Las Vegas NV Booth 534

TMS 2023 March 19 - 23 San Diego CA Booth 609

40th International Battery Seminar Exhibit March 20-23 2023 Orlando FL Booth 121

Recent Attended Shows:
AABC USA 2022 December 5 - 8 San Diego CA

2022 MRS Fall Meeting Nov 28 - Dec 2 Boston MA

Click here to see our past conferences

 
Notices
1. Prices listed online are valid for the US market and who pay by credit card only. There will be extra charges for shipping & handling. Prices vary from country to country.
2. We may add extra charges for paper orders and NET 30 terms due to extra labor costs.
3. The prices listed are subject to change without notice.